This workflow automates one of underground construction's highest-risk decisions: determining the optimal path and operational parameters for a Tunnel Boring Machine. By integrating real-time TBM telemetry with 3D geological BIM models, a custom multi-agent system continuously analyzes ground conditions, predicts settlement risk, and recommends adjustments to thrust, torque, and advance rate. The operational upside is direct: reducing unplanned stoppages, preventing costly ground movement, and improving daily excavation footage by 15-30% through data-driven optimization.