This workflow automates the high-labor, repetitive bottleneck of manually generating and analyzing preliminary bridge design options. It directly targets the 30-50% of engineering time spent on iterative load case modeling, code lookups, and comparative reporting. The operational upside comes from accelerating concept-to-viable-design cycles from weeks to days, enabling more thorough exploration of material and geometric trade-offs, and ensuring AASHTO compliance is baked into every alternative from the start, reducing downstream permit and redesign risk.