This workflow automates the critical bottleneck of manually correlating disparate weather forecasts, satellite imagery, and grid telemetry to assess ice load risk on transmission lines. By implementing a custom multi-agent system, utilities can predict conductor stress, galloping, and potential collapse hours before failure, enabling proactive de-icing campaigns or load shedding. The operational upside comes from preventing catastrophic, multi-day outages, avoiding millions in equipment replacement, and reducing emergency crew mobilization costs during severe winter events. Implementation requires integrating with weather models like GFS, satellite data providers, and SCADA systems for real-time conductor temperature and sag data.