The operational cost of manual MEP coordination stems from repetitive, error-prone clash detection across fragmented Revit, AutoCAD, and Navisworks models. Engineers waste weeks visually scanning for conflicts between ductwork, piping, and conduit, a process that delays submissions and results in an average 5-7% project cost overrun from field clashes. A custom automation layer replaces this with a system of record where design changes trigger immediate agent analysis, converting a reactive, batch-process bottleneck into a continuous, event-driven coordination loop.