Just-in-Time (JIT) material delivery is a critical path for construction margin, yet most projects fail to execute it. The operational bottleneck is the manual, fragmented coordination between the project schedule, supplier logistics, and congested site conditions. A custom multi-agent workflow automates this by ingesting the 4D BIM sequence, live site telemetry, and supplier APIs to calculate dynamic delivery windows. The savings come from eliminating double-handling, reducing on-site inventory capital, and preventing costly trade delays due to material unavailability.