This workflow automates the high-latency, manual process of interpreting disparate borehole logs, geophysical surveys, and historical data to assess site risk. By deploying a multi-agent system, you eliminate weeks of geotechnical engineering labor per project, directly reducing pre-construction delays and costly redesigns triggered by late-discovered subsurface conditions. The architecture ingests data from BIM-integrated site models (Revit, Civil 3D) and external databases, using agents to classify soil strata, flag anomalies, and initiate finite element analysis for slope stability and settlement.