This workflow automates the high-stakes economic dispatch of a semiconductor fab's largest energy loads—ultra-pure water systems, HVAC, and process tool banks—against volatile wholesale and time-of-use rates. By integrating predictive models with the fab's Manufacturing Execution System (MES) and facility SCADA, it shifts non-critical load and pre-conditions environments to capitalize on low-price windows. The operational upside is direct: a 15-30% reduction in energy spend, translating to millions annually, while maintaining strict production and ISO-class environmental constraints through real-time constraint checking.




