In custom manufacturing, manual kitting is a critical bottleneck, consuming labor, causing errors, and delaying assembly starts. This workflow automates the creation of kit lists from a customer-configured BOM, directs automated storage and retrieval systems (AS/RS) or AGVs to fetch components, and sequences their presentation at the assembly station. The operational upside comes from slashing kitting lead time by 60-80%, eliminating mis-kits that cause line stoppages, and freeing skilled labor for value-add tasks, directly protecting margin in low-volume, high-mix production.




