The operational bottleneck is the manual, error-prone process of swapping hundreds of feeder reels, nozzle kits, and stencils between board designs, which can consume hours of line downtime. A custom agentic workflow automates this by ingesting the new CAD/BOM from the PLM, simulating the changeover in a digital twin, and generating validated work orders for technicians and robots. The savings come from reducing changeover time by 60-80%, preventing misloads that cause scrap, and increasing annual line utilization, directly protecting throughput and margin in a build-to-order model.




