Manual daily fleet deployment is a costly, time-sensitive bottleneck. Supervisors waste hours reconciling project schedules in Primavera P6 with telemetry from CAT, Komatsu, and John Deere machines to assign the right asset to the right task. A custom automation workflow ingests real-time health scores, GPS location, and project priority to execute optimal allocation in minutes, not hours. This directly improves asset utilization, reduces idle time, and protects project critical paths by ensuring the most capable and available equipment is dispatched, translating to measurable labor savings and schedule adherence.




