This workflow automates the high-stakes decision of where to route blast furnace gas (BFG) every minute—to the power plant for steam, to the hot stoves for heating, or to the new carbon capture unit. The operational bottleneck is manual, suboptimal routing that wastes energy potential and leaves carbon abatement on the table. Savings come from reducing purchased natural gas, lowering the energy penalty of capture, and maximizing carbon credit generation. The solution requires integrating live data from gas analyzers, power plant SCADA, and market pricing APIs into a central optimization engine.