MEP rough-in inspection is a high-stakes, time-sensitive bottleneck. Before walls and slabs close, crews must verify that sleeves, conduit, and ductwork are installed per coordinated BIM models. Manual inspection is slow, error-prone, and often incomplete, leading to clashes discovered only during fit-out—triggering destructive rework, change orders, and project delays. A custom automated workflow replaces this fragile manual process with systematic, data-driven verification, directly targeting the six- and seven-figure costs of post-closure retrofit work.