The rapid deployment of EV chargers—from fleet depots to public networks—creates a critical pain point: concentrated, simultaneous power demand. This can cause local grid overloads, triggering costly infrastructure upgrades and demand charges that destroy project ROI. For site hosts and utilities, this unmanaged load represents a direct threat to operational stability and profitability, turning a sustainability initiative into a financial liability. The challenge is balancing customer charging expectations with the physical and economic constraints of the existing electrical infrastructure.













